Velocity Washer™ reduced customer breakout time on reactors from 18 hours to 20 minutes.

Application: Acrylonitrile reactor. Maximum uptime required to produce acrylonitrile for disposable medical PPE.

18 hours reduction in downtime due to drastically reduced likelihood of stuck / galled nuts.
Replaced their standard washers. 98% less breakout time. Self-performing equals less manpower.
Discovery work: Found 18 hours earlier. No change of produced. No hot work.

Productivity boost: After seeing results, customer installed an additional 965 Velocity Washers™ on critical flanges.

In summary:

  • 54x faster
  • Discovery work 18 hours sooner
  • 20-minute breakout
  • Less downtime, standby time, and manpower

Get A Quote Today

One of our experts will be in touch within 24 hours to provide a free quote and advice.

REQUEST A QUOTE