Velocity Washer™ reduced customer breakout time on reactors from 18 hours to 20 minutes.
Application: Acrylonitrile reactor. Maximum uptime required to produce acrylonitrile for disposable medical PPE.
18 hours reduction in downtime due to drastically reduced likelihood of stuck / galled nuts.
Replaced their standard washers. 98% less breakout time. Self-performing equals less manpower.
Discovery work: Found 18 hours earlier. No change of produced. No hot work.
Productivity boost: After seeing results, customer installed an additional 965 Velocity Washers™ on critical flanges.
In summary:
- 54x faster
- Discovery work 18 hours sooner
- 20-minute breakout
- Less downtime, standby time, and manpower